{advcss} {advhtmlcss} {advjs}

LOCATION : Home>Cases

Combined Cycle

Time : 2020-04-27

Project description : Combined cooling heat and power, 2 sets of 30MW gas-fired steam combined-cycle gas turbine, and two dual-pressure heat recovery boilers are used to support two back-pressure turbines.

Scope of supply : Steam turbine + Generator

Steam turbine model : B3.45-7/1.3 B2.3-7/2.5

Main parameters : Rated inlet steam pressure: 7.0Mpa Rated inlet steam temperature: 490°C, exhaust steam pressure 1.3 Mpa and 2.5 Mpa respectively.


RequiredWrong format
RequiredWrong format
RequiredWrong format
RequiredWrong format
RequiredWrong format
Required

© 2021 Shandong Qingneng Steam Turbine Technology Co. ,Ltd.