{advcss} {advhtmlcss} {advjs}

LOCATION : Home>Cases

Cogeneration-Shandong

Time : 2020-04-27

Project description : Using pressure difference for generating, instead of  previous temperature and pressure reducing device, high back pressure turbine.

Scope of supply : Steam turbine + Generator

Steam turbine model : B6-8.83/4.9

Main parameters : The steam pressure before the main steam valve of the steam turbine is 8.83Mpa, and the steam temperature before the main steam valve is 535°C. Exhaust pressure 4.9Mpa.


RequiredWrong format
RequiredWrong format
RequiredWrong format
RequiredWrong format
RequiredWrong format
Required

© 2021 Shandong Qingneng Steam Turbine Technology Co. ,Ltd.