Municipal solid waste power generation

Time : 2020-04-27

Project description: MSW treatment capacity 600t/d, build two 300t mechanical grate

Scope of supply : Steam turbine + Generator

Steam turbine model : N12-3.8

Main parameters : The steam pressure before the main steam valve of the steam turbine is 3.8Mpa, and the steam temperature before the main steam valve is 390°C.