{advcss} {advhtmlcss} {advjs}

LOCATION : Home>NEWS

China 2025 Jincheng Coal and Coalbed Methane Technology and Equipment Exhibition.

Time : 2025-10-21


On October 21st, 2025, the integrated unit designed, developed and manufactured by Qingneng Steam Turbine Co., Ltd made its appearance at the 2025 Jincheng Coal & Coalbed Methane Technology and Equipment Exhibition in China.


The integrated design of the steam turbine generator set enables convenient and rapid installation, shortening the on-site installation and commissioning time. The unit features a compact layout, reducing the equipment footprint. Adopting wide-load high-efficiency operation technology, the unit can operate safely and stably within the load range of 30% to 110%. Through increasing the steam turbine speed, optimizing the steam path design and precise parameter control, leading energy efficiency is achieved. This unit is suitable for application scenarios with extremely high requirements for investment efficiency, installation speed, and operational reliability, such as distributed energy, waste heat utilization in industrial parks, and biomass power generation.


Pre : Return To The List

RequiredWrong format
RequiredWrong format
RequiredWrong format
RequiredWrong format
RequiredWrong format
Required

© 2021 Shandong Qingneng Steam Turbine Technology Co. ,Ltd.